• Skip to primary navigation
  • Skip to main content
Print Logo
Town of Millville

Town of Millville

Hide Search
MENUMENU
  • Government
        • Mission Statement
        • Town Council
        • Freedom of Information Act
        • Board & Commissions
          • Ad Hoc Committee
        • Town Charter & Code
        • Departments
          • Town Manager’s Office
          • Finance Department
          • Facilities and Building Department
          • Parks & Recreation
        • Comprehensive Plan 2019
        • Town Budget
        • 2025 Millville Election Information
        • 2025 Holidays
  • Community
    • ADA Grievance Complaint Procedure
    • Americans with Disability Act
    • Building & Construction Info
    • Community Resources
    • Dogs / Animals
    • Employment Opportunities
    • Forms & Applications
    • History
    • Hometown Heroes Program
    • Local Weather Update – January 12-13, 2024 Storm
    • Public Awareness
    • Tax Assessment Information
    • Town Information
  • Evans Park
    • 2025 Evans Park Event Schedule
  • Calendar
  • Town Projects
    • Ascend By The Sea - FINAL
    • Egret Shores - FINAL
    • Gulfstream Approved - PRELIMINARY
    • Hudson's Reserve Approved - FINAL
    • Hudson's Reserve 2 year Extension Letter
    • MBTS Belle Shoal Approved - FINAL
    • MBTS Seagull Village Approved - FINAL
    • MBTS Village 5A Model Court Approved - FINAL
    • MBTS West Village C-1 Approved - FINAL
    • MBTS West Village A-2 - PRELIMINARY
    • MBTS West Village A-1 Approved - FINAL
    • Toomey (Christopher Companies) - PRELIMINARY
  • Meeting Agendas & Notices
        • Town Council Meetings
        • Meeting Minutes
        • Planning & Zoning Meetings
        • Public Notices
        • Parks & Recreation Commission
        • Ad Hoc Committee
        • Annexation Committee Meeting
        • Charter Review Committee
        • Fire & Ice 2025
  • Show Search
Home » Community » Building & Construction Info

Building & Construction Info

To obtain a Building Permit with the Town of Millville, you must provide the following:

  1. Homeowners Association (HOA) approval letter (if the residence is located within a community with an HOA);
  2. Copy of a Sussex County Building Permit (to see what projects require a Sussex County building permit, please click here);
  3. Two (2) sets of detailed plans – this often shows the dimensions, measurements, materials used for the job (Only need one for paver patios and fencing);
  4. Site survey – this is the birds-eye view plan of the lot with the structure on it, as well as where the project (i.e., fence, deck, shed, etc.) will be placed; 
  5. Completed & signed Town Building Permit application, which can be found by clicking here; and (if applicable)
  6. (For Walkways Only) Proposed topography plan (site plan including the proposed walkway, slopes, measurements, setbacks & property lines; this will be used to ensure proper water run-off)
  7. Commercial Only: Click here for Rt. 26 & Rt. 17 Commercial Building Design Standards & Guidelines and complete checklist. 

Complete and sign both pages of the Building Permit Application/Agreement form and include all applicable checklist items listed on the application.  The Town has a minimum of five (5) business days from the date the application is received to review the construction plans and return to the applicant along with the Plan Review/Building Permit fee due.

If a company/builder/contractor is hired to do the work, they will need to have a Town of Millville Business License.  

Business License 5-5-23 – FINALDownload
Building Permit Application 3-20-23 – FINALDownload

To calculate how much a building permit will cost, please refer to the Town’s Fee Schedule  

FY24 Fee ScheduleDownload

(particularly the sections: “Review of Building Plans,” and “Building Permit Fees”):


°The fee for building permits will be doubled if a permit is not obtained prior to the beginning of construction. Penalties, as specified in 155-65, are also applicable. (As per Resolution 18-05)


*Should additional inspection(s) or construction plan review be necessary, the Town will bill the applicant for any necessary additional professional fees as encumbered throughout the building process.  Professional fees must be paid by the applicant prior to the issuance of a building permit or certificate of occupancy.

**

Total Construction ValuBaseMultiplier RateTotal Permit
Up to $999.00$50
$1,000 to $40,000$50$11 per additional 1,000 > 1,001
$40,001 and Over$479$10 per additional 1,000 > 40,001

Note

Any entity exempt from Ad Valorem taxes shall not be liable for building permit fees. However, the entity will be responsible for reimbursing the town any professional engineering or legal fees associated with the permit.

No construction activity (to include the delivery and supply of materials, removal of refuse from a construction site, or the starting up of engines of mechanized construction equipment or vehicles), site preparation, site disturbance, excavation, or other similar construction shall be carried on except the days and hours (at prevailing time) follows:

(1) September 1 to May 15:

  • Monday through Friday 8:00 a.m. to 6:00 p.m.
  • Saturday: 8:00 a.m. to 4:00 p.m.

(2) May 16 to August 31:

  • Monday through Friday 7:30 a.m. to 6:00 p.m.
  • Saturday: 8:00 a.m. to 4:00 p.m.

No Construction on Sundays (Except if Homeowner is doing work)


For Minor/Major Subdivisions:

Subdivision Site Plan Application 3-20-23 – FINALDownload

Footer

Town of Millville

STAY CONNECTED

Town of Millville on Facebook Town of Millville Code Red

Town of Millville

36404 Club House Road
Millville, DE 19967
(302) 539-0449

Contact

  • Freedom of Information Act
  • 2025 Local Election Information
  • 2025 Holidays
  • Annexation Committee
  • Charter Review Committee

Quick Links

  • Online Payments and Property Tax Search

Supported and maintained by Inclind, Inc. © 2023 Town of Millville